Skip to content Skip to footer

Elk County, Pennsylvania
Hybrid Energy + Data Campus with Active Oil & Gas Operations

Captive Power | Zoned & Active | Hyperscale Ready

Elk County, Pennsylvania

Hybrid Energy + Data Campus with Active Oil & Gas Operations

Dual-Infrastructure  | Scalable | Future-Ready

$9.3 M

avg. cost per MW

Zero

Major outages, low electricity rates

$9.3 M

avg. cost per MW

Zero

Major outages, low electricity rates

Hundreds of jobs potential

The Opportunity — Why This Land Matters

The Opportunity – Why This Land Matters

Power-Secure Hyperscale Infrastructure in Northwestern Pennsylvania

This 321-acre fully-zoned hybrid energy and data center campus combines 750 MW dual-fuel generation, solar (50–75 MW), and BESS storage (10–20 MWh), integrated with active gas operations. It’s a captive-power, Tier IV-ready ecosystem designed for scalability and sustainability.

Ideal For :

Power-Integrated Data Operators
Institutional Energy Infrastructure Funds
Oil, Gas & Renewable Energy Developers

The Opportunity — Why This Land Matters

Power-Secure Hyperscale Infrastructure in Northwestern Pennsylvania

$9.3 M

avg. cost per MW

Zero

Major outages, low electricity rates

Hundreds of jobs potential

This 321-acre fully-zoned hybrid energy and data center campus combines 750 MW dual-fuel generation, solar (50–75 MW), and BESS storage (10–20 MWh), integrated with active gas operations. It’s a captive-power, Tier IV-ready ecosystem designed for scalability and sustainability.

Ideal For :

Power-Integrated Data Operators
Institutional Energy Infrastructure Funds
Oil, Gas & Renewable Energy Developers

Why Elk County Stands Apart ?

Why Elk County Stands Apart ?

Concept Plan — Designed for Captive Power + Compute Integration

321 Acres | Hybrid Power Campus | 750 MW Hyperscale Facility

The Elk County site integrates energy generation, oil & gas assets, and data operations into a single campus. It offers redundant substations, water, and fiber access, engineered for low-latency, AI-ready performance and sustainable long-term operations. ⁠

Concept Plan — Designed for Captive Power + Compute Integration

321 Acres | Hybrid Power Campus | 750 MW Hyperscale Facility

The Elk County site integrates energy generation, oil & gas assets, and data operations into a single campus. It offers redundant substations, water, and fiber access, engineered for low-latency, AI-ready performance and sustainable long-term operations. 

Have Questions? Let’s Get in Touch

Have Questions? Let’s Get in Touch

Next Steps to Ownership or Partnership

Book A Site Tour

    Get In Touch